The Five P's:  Production

Production rates are based upon the part quantity, weight, and/or area per some time period, such as an hour, shift, day, etc.

The production rate is the second factor determining the equipment size by combining the process time required. In a conveyorized system, the production rate multiplied by the product centers will provide the conveyor speed (feet per minute).

  • How many parts are produced per hour/day/week/year?
  • How many hours are worked per day, week, year?
  • What is the production rate in pounds per hour? Square feet per hour?
  • Is the production rate uniform with respect to time or must it be done in
    batches to meet other manufacturing or shipping processes?

 

 

 

 

 

 


The Five P's:  Product, Production, Paint, Process, and Plant


Paint Systems Home
-------------------------------------
System Design Basics
-------------------------------------
Coating Processes
-------------------------------------
Equipment
-------------------------------------
Turnkey Services
-------------------------------------
System Retrofit
& Relocations

-------------------------------------
Industry Links
-------------------------------------
Case Studies
-------------------------------------
Contact Us
-------------------------------------
©2007  HERR INDUSTRIAL, INC.   P.O. Box 5249, Lancaster, PA 17606-5249   1.800.700.HERR